We use report S_P99_41000111 for displaying cost components for multiple materials. However we are looking for the cost component costs incurred on the material itself, and not from the lower level materials. For example, we have a finished product with a cost component called Freight. The value in this cost component is $20. However, $15 of this freight came from the source material in a different plant. We therefore only want $5 to show in this report.
Product Cost Collectors - An Overview
Product Cost Collector (PCC) is used as a cost object in “Product Cost by Period” scenario. Get an overview of Product Cost Collector here.
What Are Costing Levels and How Are They Used in a Costing Run?
Costing level is a term used in SAP Product Cost Controlling. Learn about what Costing Levels are and how they are used in a Costing Run by reading our blog.